Announcement

Collapse
No announcement yet.

Remote Site Power

Collapse
  •  
  • Filter
  • Time
  • Show
Clear All
new posts

  • 80 Watt Solar/PV System

    80 Watt Solar/PV System

    Possibly. We can ship anywhere in the Continental United States. These radios have a maximum power consumption of about 8W @ 24V so if the system was running 24 hours a day you would need 192WH/day or 8AH/day. So with a solar insolation of 4 hours you would need 2A of panel current. This doesn't leave much extra capacity to recharge the batteries in the event of no-sun-days so you might consider increasing the panel capacity....
    Go to post

  • Pre-packaged 24VDC Solar System

    Pre-packaged 24VDC Solar System

    It varies depending on the location of the Solar/PV’s systems City/zip code. The duty cycle of your loads also varies or should we assume that the loads will be drawing currently 24X7? For the diagnostics of battery it depends if you need something on site or some sort of remote diagnostics Yes we are running 24/7. We got a PLC in the box which will be reading two 4-20ma 2-wire transmitters, which the solar must also power, but their consumption is negligible in comparison to the PLC and t...
    Go to post
There are no articles in this category.
 
  • Filter
  • Time
  • Show
Clear All
new posts
Please log in to your account to view your subscribed posts.

Article Tags

Collapse

There are no tags yet.

Latest Articles

Collapse

  • 80 Watt Solar/PV System
    by josfin
    Possibly. We can ship anywhere in the Continental United States. These radios have a maximum power consumption of about 8W @ 24V so if the system was running 24 hours a day you would need 192WH/day or 8AH/day. So with a solar insolation of 4 hours you would need 2A of panel current. This doesn't leave much extra capacity to recharge the batteries in the event of no-sun-days so you might consider increasing the panel capacity....
    04-14-2015, 01:36 PM
  • Pre-packaged 24VDC Solar System
    by josfin
    It varies depending on the location of the Solar/PV’s systems City/zip code. The duty cycle of your loads also varies or should we assume that the loads will be drawing currently 24X7? For the diagnostics of battery it depends if you need something on site or some sort of remote diagnostics Yes we are running 24/7. We got a PLC in the box which will be reading two 4-20ma 2-wire transmitters, which the solar must also power, but their consumption is negligible in comparison to the PLC and t...
    03-27-2015, 12:58 PM
Working...
X